欧美野外伦姧在线播放_亚洲欧美中文字幕国产制服动漫_欧美日韩精品在线一区_亚洲欧美高清日韩_蜜桃av无码免费看永久_中文字幕av一区二区精品_亚洲AV成人综合网伊人APP_91凹凸视频在线_欧美成人精品午夜老牛影视_亚洲第一区视频免费观看

Product
Product
Product

Bamboo Charcoal Odor Purifying Wall Paint

Add natural active bamboo charcoal molecules, effectively adsorbing indoor free formaldehyde, benzene, phenol and other harmful gases with the active ingredients in the paint film for chemical reaction, is a healthy product for renovating home users in pursuit of excellent performance and environmental protection.

功能

Add natural active bamboo charcoal molecules, effectively adsorbing indoor free formaldehyde, benzene, phenol and other harmful gases with the active ingredients in the paint film for chemical reaction, is a healthy product for renovating home users in pursuit of excellent performance and environmental protection.


Features:

● Can adsorb and decompose harmful substances in the air

●Strong anti-mold

●Bamboo charcoal adsorption factor

●Covers fine cracks

●Easy to scrub

●Good leveling


Construction method:

This product can be brushed, rolled or airless sprayed


Uses:

It is suitable for the coating of masonry, concrete, cement pressure board, gypsum board and other surfaces.


Theoretical paint consumption (based on 30μm dry film):

12-14 square meters/liter/single time (the actual coating area varies according to the roughness and dryness of the substrate surface, construction method and dilution ratio).


Construction process:

●New wall: two times of putty (sanding and cleaning) → one time of anti-alkali primer (sanding and cleaning) → two times of top coat.

●Old wall: remove mildew, sanding, cleaning → anti alkali primer one time (sanding, cleaning) → top coat two times.


Construction instructions:

After the new wall is dried, the moisture content should be less than 6% and the PH value less than 10, then use our anti-alkali primer (add appropriate amount of water to dilute and stir) for proper primer treatment. Then use top coat (add appropriate amount of water to dilute and stir) to paint two times, and the interval of recoating should not be less than 2 hours. It is not suitable for construction when the ambient temperature is lower than 5℃ or the relative humidity is more than 85%.

When working on old walls, ensure that the wall surface and putty have high strength (not loose), otherwise it is easy to cause defects such as dehiscence, cracking, peeling, poor leveling and poor water resistance.


Drying time (at 25°C):

30 minutes for surface drying, 120 minutes for hard drying


Re-coating:

At least 2 hours interval, wet weather or temperature is too low, should be extended appropriately.


Cleaning:

After stopping in the middle of painting and after finishing painting, please clean all utensils with water in time.


Storage:

Store in a cool, dry and ventilated place, prevent from freezing (not less than 0℃), the remaining paint should be sealed and stored in time.

規格參數